CHN
EMAIL
LOGIN
投资者
投资者2
投资者1
HOME
About Us
Services
Achievements
Innovation
Credit Honor
Culture
Achievements
Achievements
Rail(Beijing)
Rail(Outside of Beijing)
Civil Construction
Municipal Engineering
International Engineering
Others
Home
Achievements
Rail(Beijing)
BACK
Rail(Beijing)
轨道交通(北京)
Beijing Metro Line 7
2017-01-03
Beijing Metro Line 7 - Geotechnical Engineering InvestigationA total length of about 24km, runs through four urban areas, all for the underground line.
更多详细
Beijing Metro Line 14
2017-01-03
Beijing Metro Line 14 - Geotechnical engineering survey, engineering survey, third-party monitoring, geotechnical engineering design and construction, geological hazard assessment, empty census, detai
更多详细
Beijing Metro Line 15
2017-01-03
Beijing Metro Line 15 - Geotechnical Engineering Investigation, Engineering Survey, Third Party Monitoring, Precipitation DesignA total length of about 40.8km, runs through the north of Beijing's hori
更多详细
Beijing Metro Line 16
2017-01-03
Beijing Metro Line 16 - Geotechnical Engineering Precipitation Design, Geotechnical Engineering Survey, Engineering Survey, Geological Hazard Assessment, Detailed Survey Review, Groundwater Evaluation
更多详细
Beijing subway Yizhuang line
2017-01-03
Beijing subway Yizhuang line - BT precipitation construction, geotechnical engineering survey, engineering survey, third-party monitoringA total length of 23.23km, the precipitation construction proje
更多详细
Beijing low-speed maglev transport operation demonstration line (S1 line)
2017-01-03
Beijing low-speed maglev transport operation demonstration line (S1 line) - geotechnical engineering survey, engineering survey, geological disaster assessmentFull-length 10.165 km, all for the overhe
更多详细
1
2
3
4
Skip to:
GO